Tanker Discharge Procedure – Company Drill

Here’s another moving water drill.  If you missed the portable pond set-up drill, click here.  Move the water as you would in a water shuttle operation.  (Record and document times for later use with ISO).

Evolution Description:

The tanker stops at location A with 2-4 firefighters seat belted in.  To start evolution, the apparatus moves 200 feet to location B and discharges water load into a portable pond.  When the water discharge is complete, (ensure all firefighters are seat belted in prior to moving apparatus) the tanker moves 200 feet to location C and stops, which completes the evolution.

 

Evaluation Criteria: 

  • Demonstrate hook-up of side dump chute or pneumatic chute operations
  • Demonstrate accelerating dump process by engaging the pump, opening the tank to pump, and cracking the tank fill (Understand why if applicable)
  • Strive to safely complete evolution in < 5 minutes

Pass it on!